dc.description.abstractEl estudio, de tipo correlacional, se realizó al proyecto Centro Comercial Sur Sector Cuatro, de la empresa JE Construcciones SA; ubicada en la ciudad de Lima y parte de aplicar los lineamientos de la guía del PMBOK en la gestión del tiempo, costo y calidad; analizando y evaluando, la problemática generada en la obra durante la etapa de ejecución del periodo 15-03-15 al 15-05-15, hito importante en el proyecto. El análisis parte de dos escenarios: “Primer escenario”, representa el avance real en obra y “Segundo escenario”, representa el avance con el cronograma propuesto, calculándose el valor ganado del primer escenario que fue de S./115,342,840.09 y del segundo escenario que fue de S./153,008,434.03; que refleja la ejecución de obra sin retrasos y pérdidas económicas respecto al tiempo. La gestión de los costos, analiza las valorizaciones quincenales en la curva S para ambos escenarios, obteniéndose los indicadores que determinan el desempeño global de la obra. Para el primer escenario, la estimación a la conclusión (EAC) es S/. 216, 393,289.13 respecto al costo directo (BAC). La gestión de la calidad, implicó la aplicación del diagrama de Ishikawa y el diagrama de Pareto, evaluándose el impacto en el tiempo por los reprocesos del periodo en estudio, denotando una duración total de 76 días y el costo de S. / 86,067.90 que representa el 1.11% del periodo en estudio, conllevando a proponer el plan de calidad, protocolos para mejorar la calidad en los procesos. The study, of type correlational, was realized to the project “Centro Comercial Sur” sector four, of the company JE Constructions SA; located in the city of Lima and part of applying the alignments of guide of the PMBOK in the management of the time, cost and quality; analyzing and evaluating, the problematics generated in the work during the stage of execution of the period 15-03-15 to 15-05-15, important event in the project. The analysis departs from two scenarios: "The First scene", represents the real advance in work and "The Second scene", represents the advance with the proposed chronogram, there being calculated the earned value of the first scene that was S./115,342,840.09 and the second scene that was S./153,008,434.03; that reflects the execution of work without delays and economic losses with regard to the time. The management costs, analyzes the fortnightly valuations in the S curve for both scenarios, obtaining the indicators that determine the overall performance of the work. For the first scenario, the estimate at completion (EAC) is S /. 216, 393,289.13 regarding the direct cost (BAC). The quality management, involved the application of Ishikawa diagram and Pareto chart, evaluating the impact in time to rework the study period, implying a total duration of 76 days and the cost of S / 86,067.90 representing 1.11% of the study period, leading to propose the quality plan, protocols to improve process quality.es_ES
dc.description.uriTesises_ES
dc.formatapplication/pdfes_ES
dc.language.isospaes_ES
dc.publisherUniversidad Ricardo Palmaes_ES
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc/4.0/es_ES
dc.sourceUniversidad Ricardo Palmaes_ES
dc.sourceRepositorio institucional - URPes_ES
dc.subjectGuía del PMBOKes_ES
dc.subjectValor ganadoes_ES
dc.subjectValorizacioneses_ES
dc.subjectCurva Ses_ES
dc.subjectProtocoloses_ES
dc.subjectGuide of the PMBOKes_ES
dc.subjectEarned valuees_ES
dc.subjectValuationses_ES
dc.subjectS curvees_ES
dc.subjectProtocolses_ES
dc.titleAplicación de los lineamientos del PMBOK en la gestión de proyecto Centro Comercial Sur Sector Cuatro, San Juan de Miraflores – Limaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
thesis.degree.disciplineIngeniería Civiles_ES
thesis.degree.grantorUniversidad Ricardo Palma. Facultad de Ingenieríaes_ES
thesis.degree.levelTítulo Profesionales_ES
thesis.degree.programPrograma de Titulación por Tesises_ES
thesis.degree.nameIngeniero Civiles_ES
dc.publisher.countryPE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess